This will be made as a slab, no jamb or hinges or hardware included
Door will be 28 1/2” ×84”
Made from Solid Domestic Cherry
Roundover style profile with added small square bead, (See Picture)
Mortise and tenon construction throughout
Tempered Clear Glass 3/16” thick, set wioth Black Glazing Tape and Glass stops/Grids or “muntins”
Grids (muntins) will be simulated divided lites, front and back. Back grid will be removable via trim head screws
Stiles 5” wide
Lower rail 10” Wide wide, and top rail 7”
Stain- to best match existing stain. Likely something like a deep, dark Georgian cherry (See Pic)
Finished with General finishes high performance top coat
Price Breakdown
Base cost of 28 ½ x 84” 3149
Staining fee - 250
Over size door fee 7 foot- Waved
Local Delivery - FREE
Tempered clear Glass- Included
Grand Total 3399
Deposit will be 50% of total of cost of door and any applicable sales tax
Final payment due at time of completion
***Customer has been quoted 22+ week lead time and is OK to wait***
No guarantees for completion time may be given at this time-
This will be made as a slab, no jamb or hinges or hardware included
Door will be 28 1/2” ×84”
Made from Solid Domestic Cherry
Roundover style profile with added small square bead, (See Picture)
Mortise and tenon construction throughout
Tempered Clear Glass 3/16” thick, set wioth Black Glazing Tape and Glass stops/Grids or “muntins”
Grids (muntins) will be simulated divided lites, front and back. Back grid will be removable via trim head screws
Stiles 5” wide
Lower rail 10” Wide wide, and top rail 7”
Stain- to best match existing stain. Likely something like a deep, dark Georgian cherry (See Pic)
Finished with General finishes high performance top coat
Price Breakdown
Base cost of 28 ½ x 84” 3149
Staining fee - 250
Over size door fee 7 foot- Waved
Local Delivery - FREE
Tempered clear Glass- Included
Grand Total 3399
Deposit will be 50% of total of cost of door and any applicable sales tax
Final payment due at time of completion
***Customer has been quoted 22+ week lead time and is OK to wait***
No guarantees for completion time may be given at this time-